Frive star luxury resort that includes Private villas, kids clintond spa.
Scope of works
Design and supervisionofmeP
coldand Designof Electrical, low current, dior conditioning, tutomatic firefighting, Swimming pools, Plumbingand Pressurized cold and hotwater systems.
Designof Laundry utility, rainwater and drainage system networks..

Five star lavish resort comprising of villas, kide cluband spa..
Scope of works
Design and supervisionofmeP
coldand Designof Electrical, low current, dior conditioning, tutomatic firefighting, Swimming pools, Plumbingand Pressurized cold and hotwater systems.
Designof Laundry utility, rainwater and drainage system networks..

Asplendids star resent imposed of tom private clusters, cestaurants, utility arca and Swimming pools. multiple fis
Scope of works
Design and supervisionofmeP
coldand Designof Electrical, low current, dior conditioning, tutomatic firefighting, Swimming pools, Plumbingand Pressurized cold and hotwater systems.
Designof Laundry utility, rainwater and drainage system networks..

and This 5 hotel featums 336 elegantly appointed guestroon oppers a full range of amenities, including fine dining restaurants versatile multi purpose halts and swimming po
Scope of works
Design of ME Pservices.
Design of electrical, slow Current, Air conditioning stutomatic Firefighting system Design of Kitchen, laundry rain water and drainage system netwerks
Plumbing works including pressurizer watersystem domestic co Peland ist

45 atau hotel featuring 550 rooms, publicarea restaurants multipurpose haltband swimming pools. multipurpaschaltband
Scope of works:
- Site supervision and management.
- Design of heating, ventilation, and air conditioning systems.
Estimated cost: 50 million EGP.

A 5-star luxury village that includes residential lodges, offices, and a supermarket.
Scope of works:
- Design of plumbing systems.

A 5-star hotel with 330 guestrooms and suites, and 3 restaurants over an area of 14,000 m².
Scope of works:
- Site supervision and management.
- Design of heating, ventilation, and air conditioning systems.
Estimated cost: 50 million EGP.

The project is composed of 550 guestrooms and suites, and restaurants over an area of 15,000 m².
Scope of works:
- Site supervision and management.
- Design of heating, ventilation, and air conditioning systems.
Estimated cost: 150 million EGP.

A lavish 5-star resort featuring 265 guestrooms, 50 private chalets, full-service restaurants, multipurpose halls, and swimming pools.
Scope of works:
Scope of works:
- Design of MEP services.
- Design of Electrical, Low Current, Air Conditioning, Kitchen and Laundry systems.
- Design of utility network comprising rainwater drainage system, automatic firefighting system, and pool networks.
- Design of plumbing including pressurized domestic cold and hot water systems, sewage, and desalination plants.

A 4-star hotel consisting of guestrooms, restaurants, multipurpose hall, and swimming pools.
Scope of works:
Scope of works:
- Design of MEP services.
- Design of Electrical, Low Current, Air Conditioning, Kitchen and Laundry systems.
- Design of utility network comprising rainwater drainage system, automatic firefighting system, and pool networks.
- Design of plumbing including pressurized domestic cold and hot water systems, sewage, and desalination plants.

The resort comprises 172 guestrooms and suites, restaurants, and ballrooms over an area of 800 m². The cooling capacity is 1500 TR.
Scope of works:
- Site supervision and management.
- Design of heating, ventilation, and air conditioning systems.
Estimated cost: 10 million EGP.

A large-scale mixed-use development comprising:
- Six twin-concept residential towers, each 12 floors, totaling approximately 1000 apartments.
- A 12-story apart-hotel with 120 serviced units.
- A 5-star hotel featuring 250 guestrooms and an international health club.
Scope of works:
- Design of working drawings and details.
- Design of air conditioning and ventilation works.

Porto Al Sokhna, Marina Resort:
A resort residential project composed of:
- Residential towers block, 24 floors with 1800 flats.
- A 2-floor shopping mall.
- A 125-room beach hotel.
Scope of works:
- Working drawings and tender documents.
- Design of air conditioning and ventilation systems.

A 4-star resort comprising 260 guestrooms, 50 private chalets, restaurants, multipurpose halls, and swimming pools.
Scope of works:
- Site supervision.
- Design of electrical, air conditioning, low current, kitchen, and laundry systems.
- Design of utility networks including rainwater, drainage system, automatic firefighting system, and swimming pools.
- Design of plumbing works including pressurized domestic cold and hot water systems, sewage, and desalination plants.
Estimated MEP budget: 45 million USD.

Design and site supervision of 5 Stars hotel consisting of guest rooms, restaurants, multipurpose hall swimming pools. Scope of work: includes upgrading of the hotel services Life safety studies, waste management system, parking system air conditioning system kitchen, laundry, utility networks including rain-water network, drainage system network, automatic Fire Fighting system, Swimming pools, plumbing Scope of work include electrical motor control centers and Building management. Total MEP Budget is 45 Million U.S.D.

A 5-star hotel located in a quiet area of Cairo.
Scope of works:
- Renovation of mechanical, air conditioning, firefighting, and plumbing systems in public areas.
Estimated budget: 20 million EGP.

A 5-star hotel featuring luxurious guestrooms, restaurants, multipurpose halls, and swimming pools.
Scope of works:
- Upgrading of air conditioning, kitchen, and laundry systems.
- Upgrading of chilled water network.

A compound spanning 15,000 m² featuring 128 hotel bedrooms, 24 suites, and 380 villas.
Scope of works:
- Design of mechanical, plumbing, firefighting, ventilation, and air conditioning systems.
- Design of swimming pools, boiler room, control centers, and building management systems.

A prestigious 5-star resort spanning a total land area of 240,347 m², comprising 14 residential clusters with 481 guestrooms, club lounge, gymnasium, multiple restaurants, a main swimming pool, 11 private pools, and 3 shallow water features, in addition to arena, bar, and disco.
Scope of works:
- Kitchen and laundry systems.
Scope of works:
- Design of complete MEP systems.
- Tendering and awarding.
- Site supervision.
- Design of lighting, power, telephone, data, fire alarm, drainage, firefighting, domestic hot and cold water, air conditioning, and ventilation systems.
- Design of sewage treatment plant (STP) and water desalination plant.

A lavish 5-star hotel composed of 25 floors, restaurants, multipurpose halls, swimming pools, and 2 basement levels. The total electrical load is 2 MVA and cooling capacity is 2112 TR.
Scope of works:
- Design of MEP services.
- Design of electrical, low current, air conditioning, kitchen, and laundry systems.
- Design of utility networks including rainwater, drainage system, automatic firefighting, and swimming pool networks.
- Design of plumbing works including pressurized domestic cold and hot water systems, sewage, and desalination plants.

A premium touristic resort on an area of 150,000 m². The resort includes a hotel with 100 rooms, private villas, chalets, indoor and outdoor facilities.
Scope of works:
- Working drawings.
- Tender documents.
- Site supervision.
- Design of sanitary, firefighting, and HVAC systems.

A coastal touristic resort featuring several villas, 100 chalets, and a 50-room 3-star hotel. The total electrical load is 3 MVA.
Scope of works:
- Working drawings.
- Tender documents.
- Site supervision.
- Design of all mechanical works.

A prestigious 5-star hotel featuring an international health club. The electrical load is 1 MVA and the cooling capacity is 800 TR (water-cooled chiller).
Scope of works:
- Working drawings.
- Tender documents.
- Site supervision.
- Design of all mechanical works.

A premier 5-star resort that includes 500 rooms, 600 chalets, and 60 private suites with an electrical load of 8 MVA.
Scope of works:
Working drawings.
- Tender documents.
- Site supervision.
- Design of all mechanical works.

A luxury 5-star hotel having 200 rooms with an electrical load of 4 MVA and a cooling capacity of 200 TR (chiller plant).
Scope of works:
- Working drawings.
- Tender documents.
- Estimated budget: 8 million.

A prestigious 6-star hotel on the scenic Nile waterfront in Zamalek, comprising 5 floors and 30 suites. The total electrical load is 1 MVA and cooling capacity is 300 TR (air-cooled chiller plant).
Scope of works:
- Working drawings.
- Tender documents.
- Mechanical and electrical system design.

A 4-star hotel comprising 18 clusters, 450 rooms, 45 villas, and full amenities including lobby, reception, staff housing, swimming pools, gym, shops, horse stable, bar, disco, kitchens, cafeteria, laundry, kids club, multipurpose hall, and administration building.
Scope of works:
- Complete MEP design.
- Tendering and site supervision for 12 clusters, main restaurant, main kitchen, reception, and lobby.
- Mechanical, electrical, and low current systems.
- Lighting, power, telephone, and data networks.
- HVAC systems.
- Utility, drainage, and firefighting systems.
- Plumbing including pressurized domestic cold and hot water supply.

et landmark 5 star resortspanning around 300000 m
Comprising six distinctzanes:
Mainhotel bldg, vI Proillage, Timeshare units, staff housing and electromechanical plants.
Accommodations for 1000 guestrooms, 12 restaurants, Casino, Roman theater, sports complex, health club, bowlingalley, gymnasium and multe purpose half.
Scope of works
Preparation of working drawings and tender documents
Full site supervision,
Participation inconstruction management for HVAC systers, infrastructure network and dristristessting plant

it new 10 floor hotel building seamberly integrated with existing Sonesta Hotel featuring 160 guestrooms. The total power is 2MVA with Cooling capacity 600T. Rair Cooled chiller plant. is
Scope of work
working drawings
Tender documents and site supervision
Design of Mechanical work.

A 5-star hotel having guestrooms, restaurants, multipurpose hall, and swimming pools.
Scope of works:
- Site supervision.
- Design of central air conditioning plant, kitchen, and laundry systems.
- Design of utility networks including rainwater, drainage system, and automatic firefighting network.
- Design of plumbing works including pressurized domestic cold and hot water system.

of 5. star featuring 300 guestrooms, aninternational french health club, Luxury treatment facilities anda golf Course. The propertyis powered bya total Connected load ofynve and equipped with a 600T, Sain.co MUA
Scope of work
Working drawings
Tender documents.
Designofstir conditioning and rentilation wark

luxury touristic praject spanning 175, 700 m²and divided into 2 phasesy
Phase One:
45. star resort comprising:
- 6 clusters with 353 roomsand 4 private villas
- Restaurant, Chit lounge, gymnasium, SPA, kids area, arena, bansand disco.
- 8.swimming pools, sporto court, Kitchen and laundry
Phase two ga real estate development featuring apartment housesandvilles
Scope of work &
Design of all Me Pservices
Tendering and awarding.
Site supervision for allme Pinclusive lighting, Power, telephone, Data Fire alarm systems, Drainage, Firefighting, domestic hot and coldunta system, otir conditionning, Ventilation, seurage treatment plant(STP) and water desalination planfred)

Mövenpick Sharm Resort is a five star resort consisting of 5 different Clusters with a total of 300 Guest Rooms, 4 VIP Villas, Lobby and Reception, Staff Housing, Restaurants, Swimming Pools , Health Club , Kids Club, Shops, Horse Stable, Kitchens, Bar and Disco, Laundry, Multi purpose hall and Administration Zone that is located on Sharm El-Sheikh, Egypt. Scope of work: Complete MEP design ,tendering & awarding and site supervision for the renovation work of all MEP service including Mechanical ,Electrical, Low current , Lighting, Power , T.V and Telephone Systems and Networks ,Air conditioning and Ventilation system, utility networks , drainage system network, firefighting system, plumbing work include a pressurized domestic cold and hot water system, sewage treatment plant (STP) with capacity of 500 m3/day and desalination plants (R.O) with capacity of 800 m3/day.

of 5. star Rotel in corporating premium facilities including restaurants multi purpose halls and swimming posts. T development comprises basements and 21 Plansfullyoquipped with advanced building systems. The tola felectric load is 2 MUA supported by a cooling plant with a Capacity of 1800 TO
Scope of work & 음
Comprehensive design of me Prervices.
Electrical, low current, otir Conditioningandatutamatic
firefighting systems
Kitchen and laundry facilities.
Utility netuscks including rainwater and drainage systems
Swimming pool installations.
Plumbing work including pressurized domestic Rotand cold water Sewage and desalination plants,
pyatema

A5-star hotel Comprising guestrooms, restaurants, multipurpose halls and swimming pools.
Scope ofworks
Design of MEP workand site supervision
Air Conditioning, tutomatic firefighting and Electrical systems, Kitchen and Laundryinstallations
atility networks including rainwater and drainage systems Swimming poolservices
Plumbing works includinga pressurized domestic holand coldwater syste

et 5-star hotel development comprising & tower nurth a total builtuparca of 1,000 m² offering 330 guestrooms and suites along with 3realaurants, multipurpose halts and awimming pools.
Scope of work:
-Design, site supervisionandmanagementafs Heating, Ventilation and stir Airc conditioning agystems. Electrical motor control centers McC
Building managerment system BMS
-Renovation of hotel service facilities including Kitchen, Laundry and swimming pools
Utilitynetworben compassing rainwater and drainage systems Automatic firefighting syste
Plumbing systemsurtha pressurized domestic Ratand cold water system

AS-star hotel Consisting of guestrooms, restaurants, multipurpose hallsand swimming pools.
Redesignof the infrastructure networks
Design of Firefighling, Domestic water drainage andplant
coom systemis
Seurage Treatment
Reverse cemosis plant
Construction suppression.
Mais swimming pool design