Skip to main content

medgrp

Airport

Abu Simbel Airport, Aswan, Egypt​

A development comprising a main building and 6 auxiliary service structures with a total built-up area of 3000 m². The building is equipped with advanced infrastructure supported by a water-cooled chiller plant delivering 1680 TR.
Scope of work
design of electro-mechanical systems and HVAC (Heating, Ventilation and AC)
Plumbing and irrigation networks
Firefighting infrastructure

Sphinx International Airport

The e airport features a Central buildingand 4small service buildings of total area 22000 m². The total Cooling load is 1400 TR.
The scope of work includes
Design of electromechanical systems.
Electrical and low Correntsystems.
HVAC (Heating, ventilationand AC).
Smoke mangement and systems Plumbing and irrigation networks.
Fire Fighting and telecommunications systems.

Automated People Mover (APM), Cairo Airport, Cairo, Egypt

It's a 4 buildings dedicated to Automated People mover AP (APM) system designed to support efficient passenger Fransis within a high traffic facility.
The scope of work includes
Design review.
Value engineering

King Abdul-Aziz International Airport, Jeddah, Saudi Arabia

Concept design report for environmental air conditioning of open tents to house 250000 pilgrims.

Aden International Airport

The airport includes a main buildingandi servicestructures. totalling 18000 m² equipped with advanced facilities and air-cooled Chiller plant delivering 1400TR.
Scope of worke
Design of integrated electromechanical systemcovering Electrical and low current.
HVAC and ventilation.
Telecommunication Plumbing and irrigation Firefighting systems